Had a full day. Started roofing as soon as there was enough light. Started prep a 6:30. Started cutting the ridge vent slot with the battery power saw. At 8 I switched to the corded skill saw. Finished that and did the last run of underlayment on that side. Also drip edge and starter strip. Was about to start laying shingles and was called to the museum to unload a player piano. Helped a friend identifying the engine on the new to him trencher. Was a TJD on a ditwitch 2200 or 2300. Took a nap. Got up and it had cooled off so I went back on the roof and shingled until it was too dark to see. Like IT!
Many day I don't have the mental energy to do 1/3.
No comments:
Post a Comment