Initial target is 4% moisture with minimum clay.
Sample | Sand g | Bentonite g | Dry Post Mix g | Water-g--- | Wet Post Mix g | Observation |
---|---|---|---|---|---|---|
1 | 1000 | 40 | 1037 | 70 | unknown | Close if tightly compressed |
2 | 1000 | 60 | 1061 | 40 | 1100* | About the same no worse |
3 | 1000 | 80g 7.1% | 1080 | 40g 3.5% | 1120 | Good enough to use |
On the second sample I lost 20/60 grams of clay in part due to the wind. So I am doing it over with a 2 gallon bucket and a snap on lid. Would prefer a screw on lid but don't have them in this size. After tumbling in the 2 gallon bucket my weight was one gram extra. Well within the expected margin of error for this.
* I discovered that weighing the spray bottle does not work as significant water is lost due to evaporation and maybe droplets that never hit the sand. A better method is to spray the water onto the sand on the scale while mixing. That lets one hit the exact target number. This has me unsure of the water in sample 1.
* I discovered that weighing the spray bottle does not work as significant water is lost due to evaporation and maybe droplets that never hit the sand. A better method is to spray the water onto the sand on the scale while mixing. That lets one hit the exact target number. This has me unsure of the water in sample 1.
I am storing sample 2 in a ziplock bag. Will make an observation regarding it again in the morning. Need to bring it in so as not to freeze.
Added a few more rows to the table.
No comments:
Post a Comment